2022-2027 Bond Program Update

The second public input meeting for Comanche Lookout Park improvements was held on October 23rd, Monday evening, from 6:30 to 8:00pm, and was very well attended.  Mark Wittlinger from SA Parks and Recreation and a architectural consultant presented a prioritized list of improvements along with their estimated costs.  (The priorities were those set by a poll of neighbors and park patrons at the first public input meeting.)

The Park budget from this bond is $1,250,000.  Quite a bit, but not enough for every desired improvement (no surprise there).  These are the improvements that fit within budget

  • basic restoration of the Tower to prevent deterioration and simplify future maintenance
  • interpretive signs for landmarks and features of the park
  • better way-finding markers for trails
  • resurfacing the main loop trail with long-lasting concrete
  • full-featured public restrooms at the Nacogdoches Road parking lot
  • expanded parking at the Nacogdoches Road lot, to include a bus area
  • 24 more trash cans distributed throughout the park
  • fencing around the playground structure at the Semmes Library entrance (although this appears to be done!)
A major improvement that will probably not fit into the budget is the addition of a hilltop pavillion, which was estimated to cost between $300,000 and $400,000.  In the event that funds do come available, this would be constructed in the empty space between the Najo Jam Art Installation and the old building foundation on the hilltop.